{"id":18422,"date":"2025-04-22T08:51:52","date_gmt":"2025-04-22T06:51:52","guid":{"rendered":"https:\/\/jumbo-group.de\/?p=18422"},"modified":"2025-04-22T09:11:48","modified_gmt":"2025-04-22T07:11:48","slug":"jumbo-secures-contract-with-south-east-water-in-australia","status":"publish","type":"post","link":"https:\/\/jumbo-group.de\/en\/jumbo-secures-contract-with-south-east-water-in-australia\/","title":{"rendered":"JUMBO Secures Contract with South East Water in Australia"},"content":{"rendered":"<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien5.jpg\" alt=\"\" class=\"wp-image-18423\" srcset=\"https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien5.jpg 600w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien5-300x225.jpg 300w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien5-16x12.jpg 16w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien5-500x375.jpg 500w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p><strong>JUMBO Secures Contract with South East Water in Australia<\/strong><\/p>\n\n\n\n<p class=\"translation-block\">We are excited to announce that JUMBO has been awarded the contract for the delivery of a state-of-the-art drying and pelletizing system for the processing of wet sewage sludge to South East Water in Australia.<\/p>\n\n\n\n<p class=\"translation-block\">As part of this groundbreaking project, our CEO traveled to Australia to meet with key contacts, visit the future plant site, and get a comprehensive understanding of the local conditions. Together with the client, we discussed key steps for integrating JUMBO technology into the existing system design.<\/p>\n\n\n\n<p class=\"translation-block\">A special focus is placed on ensuring environmental compliance during operation. Our system will be integrated in a way that fully meets Australia's stringent environmental regulations\u2014a commitment we are proud to fulfill with our experience and technical expertise.<\/p>\n\n\n\n<p>We would like to thank South East Water for their trust and look forward to successfully delivering this exciting project!<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien4.jpg\" alt=\"\" class=\"wp-image-18425\" srcset=\"https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien4.jpg 600w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien4-300x225.jpg 300w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien4-16x12.jpg 16w, https:\/\/jumbo-group.de\/wp-content\/uploads\/2025Australien4-500x375.jpg 500w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p><strong>JUMBO Technology Down Under \u2013 South East Water Contract<\/strong><\/p>\n\n\n\n<p class=\"translation-block\">We are thrilled to announce a new international milestone: South East Water has tasked JUMBO with providing a drying and pelletizing system for wet sewage sludge. During a personal visit, our CEO not only toured the future plant site in Australia but also met with local partners. Together, we ensured the seamless integration of the system\u2014aiming for an efficient and environmentally compliant operation to the highest standards. We thank them for their trust!<\/p>","protected":false},"excerpt":{"rendered":"<p>JUMBO erh\u00e4lt Auftrag von South East Water in Australien Wir freuen uns, bekanntgeben zu d\u00fcrfen, dass JUMBO den Zuschlag f\u00fcr die Lieferung einer hochmodernen Trocknungs- und Pelletieranlage zur Verarbeitung von nassem Kl\u00e4rschlamm an South East Water in Australien erhalten hat. Im Rahmen dieses zukunftsweisenden Projekts reiste unser Gesch\u00e4ftsf\u00fchrer pers\u00f6nlich nach Australien, um die verantwortlichen Ansprechpartner [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":18423,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[81],"tags":[],"class_list":["post-18422","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/posts\/18422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/comments?post=18422"}],"version-history":[{"count":3,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/posts\/18422\/revisions"}],"predecessor-version":[{"id":18427,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/posts\/18422\/revisions\/18427"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/media\/18423"}],"wp:attachment":[{"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/media?parent=18422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/categories?post=18422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jumbo-group.de\/en\/wp-json\/wp\/v2\/tags?post=18422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}